Fast-Setting Concrete Mix

Get It Done Fast

When speed is the name of the game, Fast Setting Concrete Mix is your go-to. For no-mix post setting, same-day slabs, faster fences and more, Fast Setting lets you tackle more jobs in less time than you ever thought possible – if you can keep up.

Product Details

  • A fast-setting mix engineered for rapid turnaround projects or cold-weather pours
  • No mixing required when used for setting posts
  • Full-depth applications over 2"
  • Sets in 30 minutes, ready for foot traffic in 6 hours, vehicle traffic in 48 hours
  • Yields 0.38 ft3 or 1 sq. ft. at 4" deep

Application Depth

2" and over

Initial Set Time

30 Minutes

Minutes

Foot Traffic

6 Hours

Hours

Vehicle Traffic

48 Hours

Hours

Final Strength

4,000 PSI

PSI

How much product do I need?

Post Setting Calculator
Slab Pour Calculator