Project Guide – Setting Posts and Poles
Checking your local building code requirements is a critical first step whether you’re doing a simple project, like installing a mailbox, or a more involved job, like building a fence.
The most important detail to focus in on and confirm is hole depth, which varies based on the frost line in your region. It’s crucial for you to dig about 6’ below the frost line to avoid frost heave.
With that technical detail confirmed, it’s time to get to work.
Project Tip: Adding water FIRST is crucial – concrete will not hydrate evenly if water is added on top of dry mix, leading to lower strength and higher likelihood of post movement.